Level 3 · Aligned with the ASQ CSSGB Body of Knowledge (full DMAIC, statistics, SPC)
Lean Six Sigma Green Belt
Organisation, Lean, DMAIC, MSA, Cp/Cpk capability, hypothesis testing, regression, DOE basics, SPC, FMEA.
Who it is for — Improvement project leaders, quality and methods engineers, production or service managers.
Private training. The PROMACEO LEAN certificate is not a certification: it does not exempt you from any exam or prerequisite required by ASQ, IASSC, CSSC, the LCI or any other body.
Detailed syllabus
Unit 1Six Sigma and the organization
- 01The value of Six Sigma for the organizationConnect the Six Sigma approach to organizational goals and quantify its value through the cost of poor quality.3 QCM
- 02Systems, processes, roles and stakeholdersDescribe a process by its inputs, outputs and metrics, and identify who owns it and who has a stake in it.3 QCM
- 03Lean in the organization: flow, waste and constraintsApply the five Lean principles, recognize the eight wastes and manage a flow through its constraint.3 QCM
- 04Value stream mapping and Design for Six SigmaBuild a quantified VSM (cycle time, lead time, PCE, takt) and know when to use DFSS rather than DMAIC.3 QCM
Unit 2Define phase: framing the project
- 01Selecting the project and writing the charterChoose a project with a prioritization matrix and write a complete charter: problem, SMART goal, scope, metrics.3 QCM
- 02Voice of the customer: CTQ, Kano model and QFDCollect the voice of the customer, translate it into measurable critical requirements (CTQ) and prioritize it with Kano and QFD.3 QCM
- 03SIPOC, stakeholders and team dynamicsFrame the process with a SIPOC, analyse stakeholders and run an effective project team.3 QCM
- 04Planning the project and managing risksPlan a DMAIC project (Gantt, critical path, PERT), analyse its risks and pick the right one of the seven management tools.3 QCM
Unit 3Measure phase: measuring with rigour
- 01Mapping the process and collecting dataMap the process in detail, choose the data type and sampling method, and size a data-collection plan.3 QCM
- 02Descriptive statistics, probability and distributionsSummarize data by centre, spread and shape, and use the normal, binomial and Poisson distributions.3 QCM
- 03Measurement system analysis and Gage R&RQualify a measurement system (bias, linearity, stability, repeatability, reproducibility) and interpret a Gage R&R.3 QCM · 1 numerical cases
- 04Capability, sigma level and yieldCalculate and interpret Cp, Cpk, Pp, Ppk, sigma level, DPU, DPMO and RTY, and know when each index applies.3 QCM · 2 numerical cases
Unit 4Analyze phase: exploratory analysis, hypothesis testing and root causes
- 01Multi-vari studies: locating variation before testing itDesign a multi-vari sampling plan, draw the chart and determine whether the dominant variation is positional, cyclical or temporal.3 QCM
- 02Correlation and simple linear regressionCompute a correlation coefficient and a regression line, judge the slope's significance from its p-value and use the model to estimate without extrapolating.3 QCM · 1 numerical cases
- 03Hypothesis testing: fundamentals, α and β errors, powerState H0 and H1, choose α, interpret a p-value, distinguish statistical from practical significance, and size a sample from the target power.3 QCM
- 04Tests on means, variances and proportions: t, F, ANOVA, chi-squareChoose the test suited to the data (one- or two-sample t, paired t, F, ANOVA, chi-square), compute the test statistic and interpret the result against the critical value or the p-value.3 QCM
- 05Root causes, gap analysis and waste analysisLead a data-verified root cause search (Ishikawa, 5 Whys, relational matrix, fault tree, FMEA, Pareto) and quantify the gap between current and target state, including in terms of waste.3 QCM
Unit 5Improve phase: designed experiments, solution selection, pilots and Lean tools
- 01Design of experiments: vocabulary, factorial designs, effects and interactionsMaster DOE vocabulary, choose between full and fractional designs according to the run budget, and compute then interpret a main effect and an interaction.3 QCM
- 02Selecting, proving and deploying a solution: cost-benefit, pilot, PDCA, KaizenRank solutions with a weighted matrix and a cost-benefit calculation, secure deployment through proof of concept and pilot, and choose between PDCA, daily Kaizen and Kaizen blitz.3 QCM
- 03Eliminating waste: 5S, standard work, poka-yoke, pull systems and kanbanSelect and apply the Lean tool suited to an identified waste: 5S, standard work, poka-yoke mistake-proofing or a pull system sized with kanban.3 QCM
- 04Reducing cycle time: continuous flow, takt and SMEDQuantify the effect of batch size on lead time, balance a flow to takt time and lead an SMED effort by separating internal and external operations.3 QCM · 1 numerical cases
Unit 6Control phase: statistical process control, control plan and sustaining gains
- 01SPC: objectives, common and special causes, rational subgroups and chart selectionExplain what a control chart detects and does not detect, form rational subgroups and select the appropriate chart (X̄-R, X̄-S, I-MR, median, p, np, c, u) according to the data type.3 QCM
- 02Building and reading a control chart: limits, detection rules, specificationsCompute the limits of an I-MR, X̄-R, p or c chart, apply the special-cause detection rules and distinguish control limits from specification limits.3 QCM · 1 numerical cases
- 03Sustaining: control plan, documentation, training, audits, handover, TPM and visual factoryWrite a complete control plan, organise document control, training and audits, hand the process over to its owner with a measured benefit, and use TPM, Andon and Jidoka to hold the improved process.3 QCM
Mock exam
36 questions drawn at random from every unit, 60 minutes, 70% pass mark. Unlocked once every lesson and every case has been completed.
Body of knowledge
Aligned with the ASQ CSSGB Body of Knowledge (full DMAIC, statistics, SPC). References →
Certificate
When you pass the mock exam (≥ 70%), you download a personal PDF certificate with a verification QR code. It explicitly states that it is a private, non-certifying training program.
View a specimen